Sports center in Gandía
Data sheet
In the Gandia Sports Center, ABN Pipe Systems has implemented an advanced and efficient solution for its plumbing installations using the ABN//INSTAL CT FASER RD system and customized manifolds. This project reflects ABN’s commitment to innovation, sustainability and energy efficiency.
Applied Solutions
- ABN//INSTAL CT FASER RD: multilayer polypropylene pipes, resistant to corrosion and high temperatures, with anti-dilatation microfibers and UV protection.
- Custom collectors: Custom design and manufacture of collectors that optimize fluid distribution, improving hydraulic performance and facilitating installation.
Benefits highlighted
- Energy efficiency: thanks to its anti-oxygen barrier, thermal losses are minimized and system efficiency is improved.
- Sustainability: 100% recyclable and halogen-free materials, with Cradle to Cradle gold level certification.
- Durability and reduced maintenance: resistance to corrosion and disinfection processes, which prolongs the service life of the installation.
- Ease of installation: Thermofusion joining systems guarantee a safe and simple connection, without mechanical joints.
This project not only improves the functionality of the sports center, but also contributes to environmental sustainability and resource optimization, consolidating ABN Pipe Systems as a reference in innovative and environmentally responsible piping solutions.