District Heating: why a PE sleeve is the right choice for buried sections

The buried sections of a district heating network require a solution designed to maintain temperature and operate in contact with the ground. We examine why a PE jacket is suitable for this type of installation.

How to estimate the cost of an HVAC installation and fine-tune your margin

Accurately budgeting for an HVAC installation requires anticipating variables that are sometimes overlooked in the initial phase. This article proposes a systematic approach to refining the budget, focusing on planning and coordination rather than specific market prices—which frequently fluctuate depending on changes in raw material costs.

Thermofusion welding: joining methods and tips for getting it right

Thermofusion is the standard family of techniques used to join PPR pipes. It’s important to start with a key concept that is sometimes overlooked: Thermofusion is not a single procedure, but rather encompasses several joining methods, each with its own technique and steps. This article reviews the main methods and the key points for performing each one correctly.

Custom hydraulic collectors: controlled manufacturing and traceability

A hydraulic collector can be assembled on-site or custom-manufactured in a workshop. This article explains the benefits of custom manufacturing in terms of quality control, traceability, and construction scheduling, to help you determine when it is the most appropriate option.

The oxygen barrier in Insu Plus: why It matters in closed-loop HVAC systems

In closed-loop HVAC and heating systems, the system’s longevity depends largely on a factor that is not always taken into account: the ingress of oxygen into the loop. The Insu Plus oxygen barrier is specifically designed to limit that ingress. This article explains what it is, how it works, and why it is particularly important in these types of systems.

Insu Plus in aluminum or polyethylene: how to choose the right sleeve for your installation

Insu Plus is available with different outer jackets, and choosing the right one depends primarily on where and how the piping will be installed. This article explains the criteria for choosing between aluminum and polyethylene (PE) jackets to help you order the option that best suits each project.

Pre-insulated Pipe vs. On-Site Insulation: How to Plan for Each Solution

Pre-insulated piping vs. on-site insulation: two valid solutions, but with different implications for planning. We analyze how each option affects timelines, coordination among trades, and the execution of an HVAC installation.

How to Calculate the Total Cost of Insulating Pipes in an HVAC Project

Calculating the cost of insulating the pipes in an HVAC system involves more variables than are typically included in an initial estimate. In addition to materials and labor, it’s important to consider planning, coordination among trades, and site conditions. This article provides a systematic overview of the factors that influence the total cost of insulation, to help refine the estimate from the outset.

ABN Pipe Systems gathers more than 250 professionals at ABN INSU PLUS technical sessions

ABN Pipe Systems has successfully concluded the first half year of presentations of ABN INSU PLUS, its innovative pre-insulated pipe system designed to optimize installations by reducing assembly times, simplifying processes and saving costs.